CORRUSCANT BESS (27INR0195)

CORRUSCANT BESS is a 417.8 MW other interconnection project in Dickens, Texas with a current status of operational. It is proposed to connect at Tap 345kV 59904 COTTONWOOD - 60500 EDITHCLA7A.

417.8 MWCapacity
OperationalStatus
DickensMarket
OtherTechnology

Project facts

Canonical nameCORRUSCANT BESS
Queue ID27INR0195
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketDickens
TechnologyOther
Capacity417.8 MW
StateTexas
CountyDickens
Point of interconnectionTap 345kV 59904 COTTONWOOD - 60500 EDITHCLA7A
Requested (queue) date2024-02-27
Proposed in-service date
Operational date2027-04-18
Withdrawn date
DeveloperAEU Battery Project III LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata