Corson 138kV (T84)

Corson 138kV is a 350.0 MW wind interconnection project in Cape May, New Jersey with a current status of withdrawn.

350.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameCorson 138kV
Queue IDT84
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity350.0 MW
StateNew Jersey
CountyCape May
Point of interconnection
Requested (queue) date2007-10-15
Proposed in-service date2015-06-01
Operational date
Withdrawn date2012-10-15
Developer
Utility / transmission ownerAEC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.