COSO SOLAR 2 (1310)

COSO SOLAR 2 is a 206.5 MW solar interconnection project in Inyo, California with a current status of withdrawn. It is proposed to connect at Kramer 230 kV .

206.5 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameCOSO SOLAR 2
Queue ID1310
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologySolar
Capacity206.5 MW
StateCalifornia
CountyInyo
Point of interconnectionKramer 230 kV
Requested (queue) date2016-05-02
Proposed in-service date
Operational date
Withdrawn date2017-02-14
Developer
Utility / transmission ownerSCE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata