Cotulla BESS 1 (24INR0638)
Cotulla BESS 1 is a 9.9 MW battery interconnection project in La Salle, Texas with a current status of active. It is proposed to connect at Cotulla Substation XFMR 2 #460 CKT Sub max transmission - 138kv Substation name - COTULLA Bus # 8610 Load - LOAD02.
Project facts
| Canonical name | Cotulla BESS 1 |
|---|---|
| Queue ID | 24INR0638 |
| Status | active |
| Source status | active |
| Market | ERCOT |
| Technology | Battery |
| Capacity | 9.9 MW |
| State | Texas |
| County | La Salle |
| Point of interconnection | Cotulla Substation XFMR 2 #460 CKT Sub max transmission - 138kv Substation name - COTULLA Bus # 8610 Load - LOAD02 |
| Requested (queue) date | — |
| Proposed in-service date | 2026-04-20 |
| Operational date | — |
| Withdrawn date | — |
| Developer | SBESS TX10 LLC |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.