COVIL (J2116)

COVIL is a 18.0 MW gas interconnection project in Cook, Minnesota with a current status of operational. It is proposed to connect at COVIL.

18.0 MWCapacity
OperationalStatus
Market
GasTechnology

Project facts

Canonical nameCOVIL
Queue IDJ2116
Statusoperational
Source statusActive
Market
TechnologyGas
Capacity18.0 MW
StateMinnesota
CountyCook
Point of interconnectionCOVIL
Requested (queue) date2023-12-08
Proposed in-service date2022-09-01
Operational date2022-09-01
Withdrawn date
Developer
Utility / transmission ownerGREAT RIVER ENERGY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata