Cowboy Solar (21INR0461)

Cowboy Solar is a 207.7 MW solar interconnection project in Medina, Texas with a current status of withdrawn. It is proposed to connect at 8241 Razorback 138kV.

207.7 MWCapacity
WithdrawnStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameCowboy Solar
Queue ID21INR0461
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologySolar
Capacity207.7 MW
StateTexas
CountyMedina
Point of interconnection8241 Razorback 138kV
Requested (queue) date2019-11-12
Proposed in-service date2021-12-31
Operational date
Withdrawn date2020-07-13
DeveloperAP Solar 4, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata