Cranberry Highway Solar + Battery Storage is a 2.2 MW solar+battery interconnection project in Plymouth, Massachusetts with a current status of operational. It is proposed to connect at The primary connection of the proposed project to Eversource Energy is located on Tremont Station 713 Transformer #1 Line #86. The site is located approximately 2.29 circuit miles from Substation 713 near CYME® node 1200910-295. Circuit 3-86-966.
Project facts
| Canonical name | Cranberry Highway Solar + Battery Storage |
|---|---|
| Queue ID | 1022 |
| Status | operational |
| Source status | C |
| Market | SEMA |
| Technology | Solar+Battery |
| Capacity | 2.2 MW |
| State | Massachusetts |
| County | Plymouth |
| Point of interconnection | The primary connection of the proposed project to Eversource Energy is located on Tremont Station 713 Transformer #1 Line #86. The site is located approximately 2.29 circuit miles from Substation 713 near CYME® node 1200910-295. Circuit 3-86-966 |
| Requested (queue) date | 2020-04-24 |
| Proposed in-service date | — |
| Operational date | 2022-02-15 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | ISO-NE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | operational | high |
Explore related data
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.