Cranberry Highway Solar + Battery Storage (1022)

Cranberry Highway Solar + Battery Storage is a 2.2 MW solar+battery interconnection project in Plymouth, Massachusetts with a current status of operational. It is proposed to connect at The primary connection of the proposed project to Eversource Energy is located on Tremont Station 713 Transformer #1 Line #86. The site is located approximately 2.29 circuit miles from Substation 713 near CYME® node 1200910-295. Circuit 3-86-966.

2.2 MWCapacity
OperationalStatus
SEMAMarket
Solar+BatteryTechnology

Project facts

Canonical nameCranberry Highway Solar + Battery Storage
Queue ID1022
Statusoperational
Source statusC
MarketSEMA
TechnologySolar+Battery
Capacity2.2 MW
StateMassachusetts
CountyPlymouth
Point of interconnectionThe primary connection of the proposed project to Eversource Energy is located on Tremont Station 713 Transformer #1 Line #86. The site is located approximately 2.29 circuit miles from Substation 713 near CYME® node 1200910-295. Circuit 3-86-966
Requested (queue) date2020-04-24
Proposed in-service date
Operational date2022-02-15
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata