Cranberry Point Energy Storage (726)

Cranberry Point Energy Storage is a 150.0 MW battery interconnection project in Plymouth, Massachusetts with a current status of operational. It is proposed to connect at Carver 115 kV Primary POI – Loop-in station with 3-breaker ring bus interconnecting to line 127 located just south of Carver substation Alternate POI – Expand the existing station to add a 4th bay with 2 breakers to interconnect the project..

150.0 MWCapacity
OperationalStatus
SEMAMarket
BatteryTechnology

Project facts

Canonical nameCranberry Point Energy Storage
Queue ID726
Statusoperational
Source statusC
MarketSEMA
TechnologyBattery
Capacity150.0 MW
StateMassachusetts
CountyPlymouth
Point of interconnectionCarver 115 kV Primary POI – Loop-in station with 3-breaker ring bus interconnecting to line 127 located just south of Carver substation Alternate POI – Expand the existing station to add a 4th bay with 2 breakers to interconnect the project.
Requested (queue) date2018-03-21
Proposed in-service date
Operational date2025-05-16
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata