Crawfish (19INR0177)

Crawfish is a 163.2 MW wind interconnection project in Wharton, Texas with a current status of operational. It is proposed to connect at 8679 Arroz4A 138kV.

163.2 MWCapacity
OperationalStatus
ERCOTMarket
WindTechnology

Project facts

Canonical nameCrawfish
Queue ID19INR0177
Statusoperational
Source statusoperational
MarketERCOT
TechnologyWind
Capacity163.2 MW
StateTexas
CountyWharton
Point of interconnection8679 Arroz4A 138kV
Requested (queue) date2018-05-08
Proposed in-service date2025-05-21
Operational date2024-03-07
Withdrawn date
DeveloperPrairie Switch Wind, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata