Crisp Plant (753_GT2)

Crisp Plant is a 5.0 MW gas interconnection project in Worth, Georgia with a current status of operational.

5.0 MWCapacity
OperationalStatus
SOCOMarket
GasTechnology

Project facts

Canonical nameCrisp Plant
Queue ID753_GT2
Statusoperational
Source status(OP) Operating
MarketSOCO
TechnologyGas
Capacity5.0 MW
StateGeorgia
CountyWorth
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2023-06-01
Withdrawn date
Developer
Utility / transmission ownerCrisp County Power Comm

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata