Crisp County Power Comm — Interconnection Queue Projects
Crisp County Power Comm is associated with 7 tracked interconnection projects representing 40 MW of requested capacity.
Entity resolution: single source organization name; no cluster merge applied.
7Projects
0Active
5Operational
0Withdrawn
40 MWRequested capacity
0Markets
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Gas | 3 | 22 MW |
| Other | 4 | 17 MW |
Geographic footprint
| State | Projects |
|---|---|
| Georgia | 7 |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Crisp Plant | 753_1 | Gas | 12.5 MW | suspended | Worth, Georgia |
| Lake Blackshear Project | 752_4 | Other | 5.0 MW | operational | Worth, Georgia |
| Crisp Plant | 753_GT1 | Gas | 5.0 MW | suspended | Worth, Georgia |
| Lake Blackshear Project | 752_2 | Other | 5.0 MW | operational | Worth, Georgia |
| Crisp Plant | 753_GT2 | Gas | 5.0 MW | operational | Worth, Georgia |
| Lake Blackshear Project | 752_3 | Other | 4.8 MW | operational | Worth, Georgia |
| Lake Blackshear Project | 752_1 | Other | 2.4 MW | operational | Worth, Georgia |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Track queue activity connecting through Crisp County Power Comm.