Crosby BESS (24INR0546)
Crosby BESS is a 9.9 MW battery interconnection project in Harris, Texas with a current status of operational. It is proposed to connect at Station Name: TSP STATION CODE = CS_x000D_ Load Transformer name = TR3_x000D_ Bus#: PTI Bus number = 40390_x000D_ Voltage: Transmission level kV = 138 KV_x000D_ .
Project facts
| Canonical name | Crosby BESS |
|---|---|
| Queue ID | 24INR0546 |
| Status | operational |
| Source status | operational |
| Market | ERCOT |
| Technology | Battery |
| Capacity | 9.9 MW |
| State | Texas |
| County | Harris |
| Point of interconnection | Station Name: TSP STATION CODE = CS_x000D_ Load Transformer name = TR3_x000D_ Bus#: PTI Bus number = 40390_x000D_ Voltage: Transmission level kV = 138 KV_x000D_ |
| Requested (queue) date | 2023-03-09 |
| Proposed in-service date | 2025-03-14 |
| Operational date | 2025-01-21 |
| Withdrawn date | — |
| Developer | Harris Centerpoint BESS LLC |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata