Cross Trails Energy Storage Project (69244_ESR1)

Cross Trails Energy Storage Project is a 58.3 MW battery interconnection project in Scurry, Texas with a current status of operational.

58.3 MWCapacity
OperationalStatus
ERCOMarket
BatteryTechnology

Project facts

Canonical nameCross Trails Energy Storage Project
Queue ID69244_ESR1
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologyBattery
Capacity58.3 MW
StateTexas
CountyScurry
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2025-05-01
Withdrawn date—
Developer—
Utility / transmission ownerEnergy Vault, Inc.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata