CROSSROADS STORAGE (1688)

CROSSROADS STORAGE is a 300.0 MW battery interconnection project in Shasta, California with a current status of withdrawn. It is proposed to connect at Round Mountain 230 kV.

300.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameCROSSROADS STORAGE
Queue ID1688
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologyBattery
Capacity300.0 MW
StateCalifornia
CountyShasta
Point of interconnectionRound Mountain 230 kV
Requested (queue) date2020-04-15
Proposed in-service date
Operational date
Withdrawn date2024-04-04
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata