Crowded Star I BESS (25INR0473)
Crowded Star I BESS is a 202.7 MW other interconnection project in Jones, Texas with a current status of operational. It is proposed to connect at 68014 Open Sky .
202.7 MWCapacity
OperationalStatus
JonesMarket
OtherTechnology
Project facts
| Canonical name | Crowded Star I BESS |
|---|---|
| Queue ID | 25INR0473 |
| Status | operational |
| Source status | SS Completed, FIS Completed, IA |
| Market | Jones |
| Technology | Other |
| Capacity | 202.7 MW |
| State | Texas |
| County | Jones |
| Point of interconnection | 68014 Open Sky |
| Requested (queue) date | 2023-08-21 |
| Proposed in-service date | — |
| Operational date | 2027-07-09 |
| Withdrawn date | — |
| Developer | Jones City Solar II, LLC |
| Utility / transmission owner | ERCOT |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata