Crystal Hill 115 kV (AD2-043)
Crystal Hill 115 kV is a 65.5 MW solar interconnection project in Halifax, Virginia with a current status of withdrawn.
65.5 MWCapacity
WithdrawnStatus
—Market
SolarTechnology
Project facts
| Canonical name | Crystal Hill 115 kV |
|---|---|
| Queue ID | AD2-043 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | — |
| Technology | Solar |
| Capacity | 65.5 MW |
| State | Virginia |
| County | Halifax |
| Point of interconnection | — |
| Requested (queue) date | 2018-01-29 |
| Proposed in-service date | 2019-01-31 |
| Operational date | — |
| Withdrawn date | 2019-12-20 |
| Developer | — |
| Utility / transmission owner | Dominion |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-29 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.