CT additional (895)

CT additional is a 10.0 MW gas interconnection project in Tolland, Connecticut with a current status of withdrawn. It is proposed to connect at Connecticut Light and Power Company d/b/a Eversource Connecticut (ES CT) Card-Mansfield 900 Line operating at 69 kV at the North Eagleville / King Hill Road intersection.

10.0 MWCapacity
WithdrawnStatus
CTMarket
GasTechnology

Project facts

Canonical nameCT additional
Queue ID895
Statuswithdrawn
Source statusW
MarketCT
TechnologyGas
Capacity10.0 MW
StateConnecticut
CountyTolland
Point of interconnectionConnecticut Light and Power Company d/b/a Eversource Connecticut (ES CT) Card-Mansfield 900 Line operating at 69 kV at the North Eagleville / King Hill Road intersection
Requested (queue) date2019-06-27
Proposed in-service date2021-02-01
Operational date
Withdrawn date2019-08-09
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata