Cunningham 500kV (AB1-181)

Cunningham 500kV is a 28.0 MW gas interconnection project in Fluvanna, Virginia with a current status of operational.

28.0 MWCapacity
OperationalStatus
Market
GasTechnology

Project facts

Canonical nameCunningham 500kV
Queue IDAB1-181
Statusoperational
Source statusIn Service
Market
TechnologyGas
Capacity28.0 MW
StateVirginia
CountyFluvanna
Point of interconnection
Requested (queue) date2015-10-30
Proposed in-service date
Operational date2017-02-28
Withdrawn date
Developer
Utility / transmission ownerDominion

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata