Cuyamaca Peak Energy Plant (55512_CPP6)

Cuyamaca Peak Energy Plant is a 48.7 MW gas interconnection project in San Diego, California with a current status of operational.

48.7 MWCapacity
OperationalStatus
CISOMarket
GasTechnology

Project facts

Canonical nameCuyamaca Peak Energy Plant
Queue ID55512_CPP6
Statusoperational
Source status(OP) Operating
MarketCISO
TechnologyGas
Capacity48.7 MW
StateCalifornia
CountySan Diego
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2002-05-01
Withdrawn date
Developer
Utility / transmission ownerSan Diego Gas & Electric Co

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.