Cypress 138 kV Substation (J3169)

Cypress 138 kV Substation is a 200.0 MW battery interconnection project in Hardin, Texas with a current status of operational. It is proposed to connect at Cypress 138 kV Substation.

200.0 MWCapacity
OperationalStatus
Market
BatteryTechnology

Project facts

Canonical nameCypress 138 kV Substation
Queue IDJ3169
Statusoperational
Source statusActive
Market
TechnologyBattery
Capacity200.0 MW
StateTexas
CountyHardin
Point of interconnectionCypress 138 kV Substation
Requested (queue) date2022-09-14
Proposed in-service date2026-06-30
Operational date2026-06-30
Withdrawn date
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.