Hardin County, Texas — Interconnection Projects

The interXdata warehouse tracks 12 interconnection projects in Hardin, Texas, representing 1,545 MW of requested capacity.

12Total projects
2Active
5Operational
5Withdrawn
1,545 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar71,172 MW
Battery3200 MW
Gas2173 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Cypress 138 kV SubstationJ3169Battery200.0 MWoperationalHardin, Texas
Cypress 230 kVJ1849Solar200.0 MWoperationalHardin, Texas
Lumberton PV I, LLC66904_LBTNSolar200.0 MWactiveHardin, Texas
RYE CO - CYPRESS 138.0kVJ2071Solar198.0 MWoperationalHardin, Texas
RYE CO-CYPRESS 138 kVJ3194Solar198.0 MWwithdrawnHardin, Texas
Votaw Solar Station69993_VT1Solar141.0 MWactiveHardin, Texas
New Substation on Rye Co - Cypress 138 kV (Same POI as J2071)J2683Solar120.0 MWwithdrawnHardin, Texas
Warren to Kountze 138 kVJ2112Solar115.0 MWwithdrawnHardin, Texas
Hardin County Peaking Facility56604_HC1Gas86.5 MWoperationalHardin, Texas
Hardin County Peaking Facility56604_HC2Gas86.5 MWoperationalHardin, Texas
Cypress 230 kVJ2024Battery0.0 MWwithdrawnHardin, Texas
Rye Co - Cypress 138kVJ2138Battery0.0 MWwithdrawnHardin, Texas

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Hardin County.

Start tracking with interXdata