DAGGETT SOLAR 1 (1312)
DAGGETT SOLAR 1 is a 113.5 MW battery interconnection project in San Bernardino, California with a current status of operational. It is proposed to connect at Coolwater Substation 115kV.
113.5 MWCapacity
OperationalStatus
NOLMarket
BatteryTechnology
Project facts
| Canonical name | DAGGETT SOLAR 1 |
|---|---|
| Queue ID | 1312 |
| Status | operational |
| Source status | COMPLETED |
| Market | NOL |
| Technology | Battery |
| Capacity | 113.5 MW |
| State | California |
| County | San Bernardino |
| Point of interconnection | Coolwater Substation 115kV |
| Requested (queue) date | 2016-05-02 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | SCE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-29 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata