Dartmouth Power Expansion (195)
Dartmouth Power Expansion is a 24.0 MW gas interconnection project in Bristol, Massachusetts with a current status of operational. It is proposed to connect at NSTAR 115 kV line #111.
24.0 MWCapacity
OperationalStatus
SEMAMarket
GasTechnology
Project facts
| Canonical name | Dartmouth Power Expansion |
|---|---|
| Queue ID | 195 |
| Status | operational |
| Source status | C |
| Market | SEMA |
| Technology | Gas |
| Capacity | 24.0 MW |
| State | Massachusetts |
| County | Bristol |
| Point of interconnection | NSTAR 115 kV line #111 |
| Requested (queue) date | 2007-01-09 |
| Proposed in-service date | — |
| Operational date | 2009-09-24 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | ISO-NE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata