Daviess County - Utica 69.0kV (J3794)

Daviess County - Utica 69.0kV is a 50.0 MW solar interconnection project in Daviess, Kentucky with a current status of withdrawn. It is proposed to connect at Daviess County - Utica 69.0kV.

50.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameDaviess County - Utica 69.0kV
Queue IDJ3794
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity50.0 MW
StateKentucky
CountyDaviess
Point of interconnectionDaviess County - Utica 69.0kV
Requested (queue) date2024-04-18
Proposed in-service date2028-01-01
Operational date2028-01-01
Withdrawn date2025-09-25
Developer
Utility / transmission ownerBIG RIVERS ELECTRIC CORPORATION

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.