Daviess County, Kentucky — Interconnection Projects
The interXdata warehouse tracks 7 interconnection projects in Daviess, Kentucky, representing 616 MW of requested capacity.
7Total projects
0Active
0Operational
7Withdrawn
616 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 5 | 441 MW |
| Battery | 2 | 175 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Reid - Daviess Co 161 kV | J2113 | Solar | 200.0 MW | withdrawn | Daviess, Kentucky |
| F B Culley- Northeast 138kV | J2017 | Solar | 100.0 MW | withdrawn | Daviess, Kentucky |
| F.B Culley to Northeast | J2016 | Battery | 100.0 MW | withdrawn | Daviess, Kentucky |
| Reid to Daviess County 161 kV | J2480 | Battery | 75.0 MW | withdrawn | Daviess, Kentucky |
| Daviess County - Utica 69kV | J2147 | Solar | 56.0 MW | withdrawn | Daviess, Kentucky |
| Daviess County - Utica 69.0kV | J3794 | Solar | 50.0 MW | withdrawn | Daviess, Kentucky |
| Bon Harbor Tap-Stanley Tap 69kv | J2820 | Solar | 35.0 MW | withdrawn | Daviess, Kentucky |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Daviess County.
Start tracking with interXdata