Daviess County - Utica 69kV (J2147)

Daviess County - Utica 69kV is a 56.0 MW solar interconnection project in Daviess, Kentucky with a current status of withdrawn. It is proposed to connect at Daviess County - Utica 69kV.

56.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameDaviess County - Utica 69kV
Queue IDJ2147
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity56.0 MW
StateKentucky
CountyDaviess
Point of interconnectionDaviess County - Utica 69kV
Requested (queue) date2021-11-24
Proposed in-service date2024-11-30
Operational date2024-11-30
Withdrawn date2024-10-08
Developer
Utility / transmission ownerBIG RIVERS ELECTRIC CORPORATION

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata