Day County 115kV substation (GEN-2015-097)

Day County 115kV substation is a 100.0 MW wind interconnection project in Day County, South Dakota with a current status of withdrawn. It is proposed to connect at Day County 115kV substation.

100.0 MWCapacity
WithdrawnStatus
SDMarket
WindTechnology

Project facts

Canonical nameDay County 115kV substation
Queue IDGEN-2015-097
Statuswithdrawn
Source statusWITHDRAWN
MarketSD
TechnologyWind
Capacity100.0 MW
StateSouth Dakota
CountyDay County
Point of interconnectionDay County 115kV substation
Requested (queue) date2015-10-29
Proposed in-service date
Operational date
Withdrawn date2017-01-12
Developer
Utility / transmission ownerWAPA/BEPC/HCPD Integrated System

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata