De Los Santos (24INR0142)

De Los Santos is a 201.0 MW other interconnection project in Maverick, Texas with a current status of operational. It is proposed to connect at 78016 Sunglow Substation 138kV.

201.0 MWCapacity
OperationalStatus
MaverickMarket
OtherTechnology

Project facts

Canonical nameDe Los Santos
Queue ID24INR0142
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketMaverick
TechnologyOther
Capacity201.0 MW
StateTexas
CountyMaverick
Point of interconnection78016 Sunglow Substation 138kV
Requested (queue) date2022-05-10
Proposed in-service date
Operational date2027-12-01
Withdrawn date
DeveloperBRP De Los Santos BESS LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata