Maverick County, Texas — Interconnection Projects
The interXdata warehouse tracks 23 interconnection projects in Maverick, Texas, representing 2,177 MW of requested capacity.
23Total projects
3Active
18Operational
1Withdrawn
2,177 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Other | 12 | 1,139 MW |
| Solar | 3 | 718 MW |
| Battery | 5 | 318 MW |
| Gas | 3 | 1 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Sugaree Solar | 27INR0389 | Solar | 251.4 MW | operational | Maverick, Texas |
| Althea Storage | 27INR0465 | Other | 251.3 MW | operational | Maverick, Texas |
| Senator Aggreko Solar | 26INR0311 | Solar | 251.0 MW | operational | Maverick, Texas |
| Trevino Solar | 19INR0070 | Solar | 216.0 MW | withdrawn | Maverick, Texas |
| Old Victory Energy Center | 27INR0253 | Other | 202.5 MW | operational | Maverick, Texas |
| De Los Santos | 24INR0142 | Other | 201.0 MW | operational | Maverick, Texas |
| Serrano BESS | 67556_RIC97 | Battery | 185.6 MW | active | Maverick, Texas |
| Serrano Storage | 24INR0617 | Other | 185.6 MW | operational | Maverick, Texas |
| Senator Aggreko Storage | 26INR0312 | Other | 153.1 MW | operational | Maverick, Texas |
| Fort Duncan BESS | 23INR0350 | Other | 106.2 MW | suspended | Maverick, Texas |
| Fort Duncan BESS | 67752_FTDUN | Battery | 102.6 MW | operational | Maverick, Texas |
| Escondido BESS | 25INR0593 | Other | 10.0 MW | active | Maverick, Texas |
| BRP Pueblo II BESS | 22INR0582 | Other | 9.9 MW | operational | Maverick, Texas |
| BRP Pueblo I BESS | 22INR0581 | Other | 9.9 MW | operational | Maverick, Texas |
| Pueblo BA | 64318_PBL2 | Battery | 9.9 MW | operational | Maverick, Texas |
| Pueblo BA | 64318_PBL1 | Battery | 9.9 MW | operational | Maverick, Texas |
| Regis Escondido | 69332_ESCON | Battery | 9.9 MW | active | Maverick, Texas |
| Eagle Pass | 3437_3 | Other | 3.2 MW | operational | Maverick, Texas |
| Eagle Pass | 3437_2 | Other | 3.2 MW | operational | Maverick, Texas |
| Eagle Pass | 3437_1 | Other | 3.2 MW | operational | Maverick, Texas |
| WAL461 | 64778_GEN2 | Gas | 0.4 MW | operational | Maverick, Texas |
| WAL461 | 64778_GEN3 | Gas | 0.4 MW | operational | Maverick, Texas |
| WAL461 | 64778_GEN1 | Gas | 0.4 MW | operational | Maverick, Texas |
Top developers
| Developer (canonical) | Projects | Capacity |
|---|---|---|
| Sugaree Solar LLC | 2 | 503 MW |
| Nova Clean Energy LLC | 1 | 202 MW |
| Maverick ESS, LLC | 1 | 186 MW |
| S&R SOLAR DESIGN CORP | 1 | 216 MW |
| Senator Aggreko Solar LLC | 1 | 251 MW |
| Regis Escondido LLC | 1 | 10 MW |
| BRP De Los Santos BESS LLC | 1 | 201 MW |
| Fort Duncan BESS, LLC | 1 | 106 MW |
| Senator Aggreko Storage LLC | 1 | 153 MW |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-28
Page data generated2026-08-28
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); ERCOT — Generation Interconnection Status (GIS) report; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Maverick County.
Start tracking with interXdata