DESERT GARNET PV is a 450.0 MW solar interconnection project in San Bernardino, California with a current status of withdrawn. It is proposed to connect at BLM West-Kramer 230kV line.

450.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameDESERT GARNET PV
Queue ID220
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologySolar
Capacity450.0 MW
StateCalifornia
CountySan Bernardino
Point of interconnectionBLM West-Kramer 230kV line
Requested (queue) date2007-05-23
Proposed in-service date
Operational date
Withdrawn date2009-12-07
Developer
Utility / transmission ownerSCE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.