DG AMP Solar Brewster (61818_AMPBR)

DG AMP Solar Brewster is a 1.9 MW solar interconnection project in Stark, Ohio with a current status of operational.

1.9 MWCapacity
OperationalStatus
PJMMarket
SolarTechnology

Project facts

Canonical nameDG AMP Solar Brewster
Queue ID61818_AMPBR
Statusoperational
Source status(OP) Operating
MarketPJM
TechnologySolar
Capacity1.9 MW
StateOhio
CountyStark
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2018-12-01
Withdrawn date—
Developer—
Utility / transmission ownerDG AMP Solar, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-11

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata