Stark County, Ohio — Interconnection Projects

The interXdata warehouse tracks 9 interconnection projects in Stark, Ohio, representing 964 MW of requested capacity.

9Total projects
1Active
1Operational
7Withdrawn
964 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar8564 MW
Battery1400 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
PJM Queue Project AH1-752 — Battery in Stark, OhioAH1-752Battery400.0 MWwithdrawnStark, Ohio
Stark Solar, LLC66672_AG239Solar150.0 MWactiveStark, Ohio
Blue Bell-Canton Central 138 kVAG1-239Solar150.0 MWwithdrawnStark, Ohio
SE Canton 138 kVAH1-655Solar100.0 MWwithdrawnStark, Ohio
Sunnyside – Carrolton 138 kVAH1-350Solar92.4 MWwithdrawnStark, Ohio
East Canton-Robertsville 69 kVAG2-031Solar30.2 MWwithdrawnStark, Ohio
East Canton-Robertsville 69 kVAE2-195Solar19.7 MWwithdrawnStark, Ohio
Bolivar 34.5 kVAE2-204Solar19.3 MWwithdrawnStark, Ohio
DG AMP Solar Brewster61818_AMPBRSolar1.9 MWoperationalStark, Ohio

Top developers

Developer (canonical)ProjectsCapacity
Cardinal Energy Storage East, LLC1400 MW

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Stark County.

Start tracking with interXdata