The interXdata warehouse tracks 9 interconnection projects in Stark, Ohio, representing 964 MW of requested capacity.
9Total projects
1Active
1Operational
7Withdrawn
964 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 8 | 564 MW |
| Battery | 1 | 400 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| PJM Queue Project AH1-752 — Battery in Stark, Ohio | AH1-752 | Battery | 400.0 MW | withdrawn | Stark, Ohio |
| Stark Solar, LLC | 66672_AG239 | Solar | 150.0 MW | active | Stark, Ohio |
| Blue Bell-Canton Central 138 kV | AG1-239 | Solar | 150.0 MW | withdrawn | Stark, Ohio |
| SE Canton 138 kV | AH1-655 | Solar | 100.0 MW | withdrawn | Stark, Ohio |
| Sunnyside – Carrolton 138 kV | AH1-350 | Solar | 92.4 MW | withdrawn | Stark, Ohio |
| East Canton-Robertsville 69 kV | AG2-031 | Solar | 30.2 MW | withdrawn | Stark, Ohio |
| East Canton-Robertsville 69 kV | AE2-195 | Solar | 19.7 MW | withdrawn | Stark, Ohio |
| Bolivar 34.5 kV | AE2-204 | Solar | 19.3 MW | withdrawn | Stark, Ohio |
| DG AMP Solar Brewster | 61818_AMPBR | Solar | 1.9 MW | operational | Stark, Ohio |
Top developers
| Developer (canonical) | Projects | Capacity |
|---|---|---|
| Cardinal Energy Storage East, LLC | 1 | 400 MW |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-28
Page data generated2026-08-28
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Stark County.
Start tracking with interXdata