DG Crystal Spring CSG (61555_SPRIN)

DG Crystal Spring CSG is a 4.2 MW solar interconnection project in Plymouth, Massachusetts with a current status of operational.

4.2 MWCapacity
OperationalStatus
ISNEMarket
SolarTechnology

Project facts

Canonical nameDG Crystal Spring CSG
Queue ID61555_SPRIN
Statusoperational
Source status(OP) Operating
MarketISNE
TechnologySolar
Capacity4.2 MW
StateMassachusetts
CountyPlymouth
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2017-07-01
Withdrawn date—
Developer—
Utility / transmission ownerDG Crystal Spring LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata