Dillon Gulch Wind (19INR0172)
Dillon Gulch Wind is a 175.0 MW wind interconnection project in Nolan, Texas with a current status of withdrawn. It is proposed to connect at tap 345kV 11420 Sweetwater East - 11406 Central Bluff.
175.0 MWCapacity
WithdrawnStatus
ERCOTMarket
WindTechnology
Project facts
| Canonical name | Dillon Gulch Wind |
|---|---|
| Queue ID | 19INR0172 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | ERCOT |
| Technology | Wind |
| Capacity | 175.0 MW |
| State | Texas |
| County | Nolan |
| Point of interconnection | tap 345kV 11420 Sweetwater East - 11406 Central Bluff |
| Requested (queue) date | 2018-04-11 |
| Proposed in-service date | 2020-12-15 |
| Operational date | — |
| Withdrawn date | 2020-03-13 |
| Developer | AES DE DEVCO NC LLC |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.