Dionysus Solar (26INR0176)

Dionysus Solar is a 153.3 MW solar interconnection project in Houston, Texas with a current status of operational. It is proposed to connect at Tap 138kV 6733 Mustang Prairie - 6732 Latexo.

153.3 MWCapacity
OperationalStatus
HoustonMarket
SolarTechnology

Project facts

Canonical nameDionysus Solar
Queue ID26INR0176
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketHouston
TechnologySolar
Capacity153.3 MW
StateTexas
CountyHouston
Point of interconnectionTap 138kV 6733 Mustang Prairie - 6732 Latexo
Requested (queue) date2023-06-28
Proposed in-service date
Operational date2027-03-11
Withdrawn date
DeveloperDionysus Solar, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata