Distribution line feeding Wolfforth substation (ASGI-2019-002)

Distribution line feeding Wolfforth substation is a 4.5 MW wind interconnection project in Lubbock County, Texas with a current status of withdrawn. It is proposed to connect at Distribution line feeding Wolfforth substation.

4.5 MWCapacity
WithdrawnStatus
TXMarket
WindTechnology

Project facts

Canonical nameDistribution line feeding Wolfforth substation
Queue IDASGI-2019-002
Statuswithdrawn
Source statusWITHDRAWN
MarketTX
TechnologyWind
Capacity4.5 MW
StateTexas
CountyLubbock County
Point of interconnectionDistribution line feeding Wolfforth substation
Requested (queue) date2019-04-23
Proposed in-service date
Operational date
Withdrawn date2021-07-29
Developer
Utility / transmission ownerSPP

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.