Distribution line feeding Wolfforth substation (ASGI-2019-002)
Distribution line feeding Wolfforth substation is a 4.5 MW wind interconnection project in Lubbock County, Texas with a current status of withdrawn. It is proposed to connect at Distribution line feeding Wolfforth substation.
4.5 MWCapacity
WithdrawnStatus
TXMarket
WindTechnology
Project facts
| Canonical name | Distribution line feeding Wolfforth substation |
|---|---|
| Queue ID | ASGI-2019-002 |
| Status | withdrawn |
| Source status | WITHDRAWN |
| Market | TX |
| Technology | Wind |
| Capacity | 4.5 MW |
| State | Texas |
| County | Lubbock County |
| Point of interconnection | Distribution line feeding Wolfforth substation |
| Requested (queue) date | 2019-04-23 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | 2021-07-29 |
| Developer | — |
| Utility / transmission owner | SPP |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata