Lubbock County County, Texas — Interconnection Projects
The interXdata warehouse tracks 10 interconnection projects in Lubbock County, Texas, representing 498 MW of requested capacity.
10Total projects
0Active
0Operational
10Withdrawn
498 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Gas | 2 | 434 MW |
| Wind | 8 | 64 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Jones 230kV | GEN-2009-002 | Gas | 306.0 MW | withdrawn | Lubbock County, Texas |
| Jones 230kV | GEN-2009-001 | Gas | 128.0 MW | withdrawn | Lubbock County, Texas |
| GEN-2007-031 | GEN-2007-031 | Wind | 51.0 MW | withdrawn | Lubbock County, Texas |
| Distribution line feeding Wolfforth substation | ASGI-2019-002 | Wind | 4.5 MW | withdrawn | Lubbock County, Texas |
| Wolfforth 115kV substation #526524 | ASGI-2016-001 | Wind | 2.5 MW | withdrawn | Lubbock County, Texas |
| ASGI-2013-006 | ASGI-2013-006 | Wind | 2.0 MW | withdrawn | Lubbock County, Texas |
| Yuma Delivery Point | ASGI-2015-002 | Wind | 2.0 MW | withdrawn | Lubbock County, Texas |
| Erskine 115kV bus | ASGI-2014-013 | Wind | 2.0 MW | withdrawn | Lubbock County, Texas |
| ASGI-2016-002 | ASGI-2016-002 | Wind | 0.3 MW | withdrawn | Lubbock County, Texas |
| ASGI-2014-001 | ASGI-2014-001 | Wind | 0.0 MW | withdrawn | Lubbock County, Texas |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Lubbock County County.
Start tracking with interXdata