Dogfish BESS (23INR0219)

Dogfish BESS is a 78.2 MW battery interconnection project in Pecos, Texas with a current status of operational. It is proposed to connect at tap 138kV 38331 TN Alamo St – 38455 TN Holiday_x000D_ .

78.2 MWCapacity
OperationalStatus
ERCOTMarket
BatteryTechnology

Project facts

Canonical nameDogfish BESS
Queue ID23INR0219
Statusoperational
Source statusoperational
MarketERCOT
TechnologyBattery
Capacity78.2 MW
StateTexas
CountyPecos
Point of interconnectiontap 138kV 38331 TN Alamo St – 38455 TN Holiday_x000D_
Requested (queue) date2021-03-15
Proposed in-service date2025-04-16
Operational date2025-02-19
Withdrawn date
DeveloperDogfish ESS Assets, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.