Dogwood Creek Storage (24INR0371)

Dogwood Creek Storage is a 431.3 MW other interconnection project in Bastrop, Texas with a current status of withdrawn. It is proposed to connect at tap 345kV 7040 Austrop - 9041 Lost Pines.

431.3 MWCapacity
WithdrawnStatus
ERCOTMarket
OtherTechnology

Project facts

Canonical nameDogwood Creek Storage
Queue ID24INR0371
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyOther
Capacity431.3 MW
StateTexas
CountyBastrop
Point of interconnectiontap 345kV 7040 Austrop - 9041 Lost Pines
Requested (queue) date2022-07-04
Proposed in-service date2025-05-31
Operational date
Withdrawn date2024-01-03
DeveloperDogwood Creek Solar LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.