Donelson Solar SLF (27INR0292)

Donelson Solar SLF is a 75.4 MW solar interconnection project in Red River, Texas with a current status of operational. It is proposed to connect at Tap the 69 kV Bagwell (#1785) - Clarksville (#11784) line, ONCOR.

75.4 MWCapacity
OperationalStatus
Red RiverMarket
SolarTechnology

Project facts

Canonical nameDonelson Solar SLF
Queue ID27INR0292
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketRed River
TechnologySolar
Capacity75.4 MW
StateTexas
CountyRed River
Point of interconnectionTap the 69 kV Bagwell (#1785) - Clarksville (#11784) line, ONCOR
Requested (queue) date2025-03-24
Proposed in-service date
Operational date2028-10-17
Withdrawn date
DeveloperDonelson Solar
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata