Red River County, Texas — Interconnection Projects

The interXdata warehouse tracks 6 interconnection projects in Red River, Texas, representing 940 MW of requested capacity.

6Total projects
0Active
6Operational
0Withdrawn
940 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar4811 MW
Other2129 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Delilah Solar Energy II LLC63884_GEN1Solar310.0 MWoperationalRed River, Texas
Delilah Solar Energy LLC63194_GEN1Solar300.0 MWoperationalRed River, Texas
Silverbell Storage28INR0124Other129.2 MWoperationalRed River, Texas
Silverbell Solar28INR0125Solar125.6 MWoperationalRed River, Texas
Donelson Solar SLF27INR0292Solar75.4 MWoperationalRed River, Texas
Donelson Storage SLF27INR0293Other0.0 MWoperationalRed River, Texas

Top developers

Developer (canonical)ProjectsCapacity
Silverbell Energy Center, LLC2255 MW
Donelson Storage10 MW
Donelson Solar175 MW

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Red River County.