Double A Solar SLF (27INR0248)

Double A Solar SLF is a 132.6 MW solar interconnection project in Goliad, Texas with a current status of operational. It is proposed to connect at Tap 69kV 5678 Schroeder - 5675 Big Oak.

132.6 MWCapacity
OperationalStatus
GoliadMarket
SolarTechnology

Project facts

Canonical nameDouble A Solar SLF
Queue ID27INR0248
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketGoliad
TechnologySolar
Capacity132.6 MW
StateTexas
CountyGoliad
Point of interconnectionTap 69kV 5678 Schroeder - 5675 Big Oak
Requested (queue) date2024-06-13
Proposed in-service date
Operational date2028-05-31
Withdrawn date
DeveloperDouble Lock Solar, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-28

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata