Double Toll Gate 138kV (V4-053)

Double Toll Gate 138kV is a 20.0 MW solar interconnection project in Clarke, Virginia with a current status of withdrawn.

20.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameDouble Toll Gate 138kV
Queue IDV4-053
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity20.0 MW
StateVirginia
CountyClarke
Point of interconnection
Requested (queue) date2009-12-30
Proposed in-service date2011-11-01
Operational date
Withdrawn date2012-11-28
Developer
Utility / transmission ownerAPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.