Dovetail Solar 3 (24INR0097)

Dovetail Solar 3 is a 666.1 MW solar interconnection project in Jack, Texas with a current status of operational. It is proposed to connect at Tap 345kV 1421 Willow Creek – 11523 THOMPRIC.

666.1 MWCapacity
OperationalStatus
JackMarket
SolarTechnology

Project facts

Canonical nameDovetail Solar 3
Queue ID24INR0097
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketJack
TechnologySolar
Capacity666.1 MW
StateTexas
CountyJack
Point of interconnectionTap 345kV 1421 Willow Creek – 11523 THOMPRIC
Requested (queue) date2021-12-13
Proposed in-service date
Operational date2029-04-20
Withdrawn date
DeveloperHecate Energy
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.