Dry Creek Solar II (27INR0488)

Dry Creek Solar II is a 203.4 MW solar interconnection project in Rusk, Texas with a current status of operational. It is proposed to connect at Dorsett 345 kV Switching Station(tap 345 kV 3100 Martin Lake - 3105 Elkton).

203.4 MWCapacity
OperationalStatus
RuskMarket
SolarTechnology

Project facts

Canonical nameDry Creek Solar II
Queue ID27INR0488
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketRusk
TechnologySolar
Capacity203.4 MW
StateTexas
CountyRusk
Point of interconnectionDorsett 345 kV Switching Station(tap 345 kV 3100 Martin Lake - 3105 Elkton)
Requested (queue) date2025-06-19
Proposed in-service date
Operational date2028-02-01
Withdrawn date
DeveloperOak Hill Solar II LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata