Rusk County, Texas — Interconnection Projects
The interXdata warehouse tracks 15 interconnection projects in Rusk, Texas, representing 4,916 MW of requested capacity.
15Total projects
1Active
13Operational
0Withdrawn
4,916 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Other | 5 | 2,891 MW |
| Gas | 4 | 940 MW |
| Solar | 4 | 631 MW |
| Battery | 2 | 455 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Martin Lake | 6146_3 | Other | 793.2 MW | operational | Rusk, Texas |
| Martin Lake | 6146_1 | Other | 793.2 MW | operational | Rusk, Texas |
| Martin Lake | 6146_2 | Other | 793.2 MW | operational | Rusk, Texas |
| Tenaska Gateway Generating Station | 55132_STG1 | Gas | 390.0 MW | operational | Rusk, Texas |
| Brantley Branch Batt | 22INR0332 | Other | 302.4 MW | operational | Rusk, Texas |
| Railway BESS | 25INR0284 | Battery | 254.8 MW | suspended | Rusk, Texas |
| Zeus Rusk BESS | 25INR0591 | Other | 208.8 MW | operational | Rusk, Texas |
| Dry Creek Solar II | 27INR0488 | Solar | 203.4 MW | operational | Rusk, Texas |
| Dry Creek Solar I | 23INR0286 | Solar | 201.1 MW | operational | Rusk, Texas |
| Oak Hill - Dry Creek | 64132_PV1 | Solar | 200.0 MW | operational | Rusk, Texas |
| Tenaska Switching Substation 345kV | GEN-2020-081 | Battery | 200.0 MW | active | Rusk, Texas |
| Tenaska Gateway Generating Station | 55132_GTG2 | Gas | 183.2 MW | operational | Rusk, Texas |
| Tenaska Gateway Generating Station | 55132_GTG3 | Gas | 183.2 MW | operational | Rusk, Texas |
| Tenaska Gateway Generating Station | 55132_GTG1 | Gas | 183.2 MW | operational | Rusk, Texas |
| Zeus Rusk Solar | 25INR0590 | Solar | 26.8 MW | operational | Rusk, Texas |
Top developers
| Developer (canonical) | Projects | Capacity |
|---|---|---|
| Oak Hill Solar II LLC | 2 | 404 MW |
| Brantley Branch LLC | 1 | 302 MW |
| Rusk Solar, LLC | 1 | 27 MW |
| Rusk BESS, LLC | 1 | 209 MW |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); ERCOT — Generation Interconnection Status (GIS) report; Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.