Duke Energy Carolinas (031510)

Duke Energy Carolinas is a 602.0 MW gas interconnection project in Anderson, South Carolina with a current status of withdrawn. It is proposed to connect at Goucha 230 kV.

602.0 MWCapacity
WithdrawnStatus
SCMarket
GasTechnology

Project facts

Canonical nameDuke Energy Carolinas
Queue ID031510
Statuswithdrawn
Source statusWithdrawn
MarketSC
TechnologyGas
Capacity602.0 MW
StateSouth Carolina
CountyAnderson
Point of interconnectionGoucha 230 kV
Requested (queue) date2019-02-27
Proposed in-service date
Operational date
Withdrawn date
DeveloperDuke Energy Florida, LLC
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: duke-dec-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata