Duke Energy Carolinas, LLC (977299)

Duke Energy Carolinas, LLC is a 199.0 MW battery interconnection project in Gaston, North Carolina with a current status of active. It is proposed to connect at Riverbend BESS / Stonewater Tie 100 kV.

199.0 MWCapacity
ActiveStatus
NCMarket
BatteryTechnology

Project facts

Canonical nameDuke Energy Carolinas, LLC
Queue ID977299
Statusactive
Source statusPhase 2 Cluster Study
MarketNC
TechnologyBattery
Capacity199.0 MW
StateNorth Carolina
CountyGaston
Point of interconnectionRiverbend BESS / Stonewater Tie 100 kV
Requested (queue) date2025-06-18
Proposed in-service date—
Operational date—
Withdrawn date—
DeveloperDuke Energy Florida, LLC
Utility / transmission ownerDuke Energy Progress

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_project—activehigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: duke-dec-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata