Duke Energy Florida, Clu Gs rt oe ur pSub Inte Cr uco stn on mec et rion Queue LLCTransit (931213)
Duke Energy Florida, Clu Gs rt oe ur pSub Inte Cr uco stn on mec et rion Queue LLCTransit is a 74.9 MW solar interconnection project in Hamilton County Facility, Florida with a current status of operational. It is proposed to connect at Twin Rivers Switching Station Point of Interconnection.
74.9 MWCapacity
OperationalStatus
FLMarket
SolarTechnology
Project facts
| Canonical name | Duke Energy Florida, Clu Gs rt oe ur pSub Inte Cr uco stn on mec et rion Queue LLCTransit |
|---|---|
| Queue ID | 931213 |
| Status | operational |
| Source status | Suspended 12/31/2025 E Ss Operational Status |
| Market | FL |
| Technology | Solar |
| Capacity | 74.9 MW |
| State | Florida |
| County | Hamilton County Facility |
| Point of interconnection | Twin Rivers Switching Station Point of Interconnection |
| Requested (queue) date | 2023-11-17 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | Duke Energy Florida, LLC |
| Utility / transmission owner | Duke Energy Progress |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata