Duke Energy Florida, LLC Clu Gs rt oe ur pSub Inte Cr uco stn on mec et rion Queue (027138)
Duke Energy Florida, LLC Clu Gs rt oe ur pSub Inte Cr uco stn on mec et rion Queue is a 597.0 MW gas interconnection project in Lake Florida County Facility, Florida with a current status of withdrawn. It is proposed to connect at Central Florida Substation Point of Interconnection.
597.0 MWCapacity
WithdrawnStatus
FLMarket
GasTechnology
Project facts
| Canonical name | Duke Energy Florida, LLC Clu Gs rt oe ur pSub Inte Cr uco stn on mec et rion Queue |
|---|---|
| Queue ID | 027138 |
| Status | withdrawn |
| Source status | Withdrawn E Ss Operational Status |
| Market | FL |
| Technology | Gas |
| Capacity | 597.0 MW |
| State | Florida |
| County | Lake Florida County Facility |
| Point of interconnection | Central Florida Substation Point of Interconnection |
| Requested (queue) date | 2004-12-24 |
| Proposed in-service date | 2009-06-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Duke Energy Florida, LLC |
| Utility / transmission owner | Duke Energy Progress |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata