Duke Energy Florida, LLC Clu Gs rt oe ur pSub Inte Cr uco stn on mec et rion Queue (027138)

Duke Energy Florida, LLC Clu Gs rt oe ur pSub Inte Cr uco stn on mec et rion Queue is a 597.0 MW gas interconnection project in Lake Florida County Facility, Florida with a current status of withdrawn. It is proposed to connect at Central Florida Substation Point of Interconnection.

597.0 MWCapacity
WithdrawnStatus
FLMarket
GasTechnology

Project facts

Canonical nameDuke Energy Florida, LLC Clu Gs rt oe ur pSub Inte Cr uco stn on mec et rion Queue
Queue ID027138
Statuswithdrawn
Source statusWithdrawn E Ss Operational Status
MarketFL
TechnologyGas
Capacity597.0 MW
StateFlorida
CountyLake Florida County Facility
Point of interconnectionCentral Florida Substation Point of Interconnection
Requested (queue) date2004-12-24
Proposed in-service date2009-06-01
Operational date
Withdrawn date
DeveloperDuke Energy Florida, LLC
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.